Use these resources to prepare transformer and substation project communication before sending an RFQ or technical specification.

Sanbian Sci-Tech Company Video

Public company video for Sanbian Sci-Tech transformer and substation project teams.

https://youtu.be/RX0MYh6lfEI

RFQ checklist

  • Project country or region
  • Application and project type
  • Product type and voltage level
  • Rated capacity and quantity
  • Applicable standard and site conditions
  • Technical specification or tender document if available

FAT checklist

  • Agreed test standard and scope
  • Routine electrical tests
  • Inspection participants and schedule
  • Documentation and test report expectations
  • Packing and shipment readiness check

Solar step-up notes

  • PV plant capacity and block design
  • Grid code and voltage requirements
  • Site environment and altitude
  • Transformer capacity and quantity
  • Interface with inverter, switchgear or substation equipment